top of page
IMG_0560.JPEG

Mission

Similar demands are being made by local authorities to insist developers achieve a high level of efficiency and low levels of greenhouse emissions on new build projects. These demands can only be met by a detailed energy-efficient design strategy in accordance with the associate rating criteria. High-quality construction and building services installation standards, combined with thorough testing and commissioning of the building services systems for the entire development ensure that necessary requirements are met.

Vision

3RD Party International, acting as the project Commissioning Authority, will assist in achieving the desired Green rating goals. By identifying, managing, and verifying the commissioning requirements of the project, we ensure the necessary commissioning and prerequisite credits are achieved, and the building performance parameters are met.

IMG_8250.JPG

enquiry@3rdpartyinternational.com

  • LinkedIn

3PI

www.3rdpartyinternational.com

Level 6 & 7 Residensi Tribeca No.215 Jalan Imbi, 55100
Kuala Lumpur, Malaysia

bottom of page